Friday, July 11, 2025
  • Login
SUBSCRIBE
Carroll County Observer
82.2 °f
Huntingdon
  • News
  • Sports
  • Society
  • Editorial
  • Obituaries
  • Public Notices
  • Weather
No Result
View All Result
  • News
  • Sports
  • Society
  • Editorial
  • Obituaries
  • Public Notices
  • Weather
No Result
View All Result
Carroll County Observer
No Result
View All Result
  • News
  • Sports
  • Society
  • Editorial
  • Obituaries
  • Public Notices
  • Weather
Home News

TDOT Lane Closure Report West Tennessee District 47 June 11-18, 2025

by Observer Staff
June 12, 2025
in News
Reading Time: 4 mins read
0
0
SHARES
128
VIEWS
Share on FacebookShare on Twitter

There will be possible DAYTIME or NIGHTTIME lane closures at various locations in Region 4 to make repairs or new installs on an as needed basis at various locations throughout multiple counties.

BENTON COUNTY

I-40 at Exit 126: The grading, drainage, and paving on I-40 at the US-641 (SR-69) interchange (Exit 126) will cause temporary lane closures throughout the project.

SR-69: The Resurfacing on SR69 from the Decatur County line to James Walker Road will cause temporary lane closures throughout the project.

CARROLL COUNTY

SR-1: The Resurfacing on SR1 (US 70) from near Rutherford Fork Obion River to SR22 includes all directions of Huntingdon Square) will cause temporary nightly and daily lane closures throughout the project for milling and paving.

SR-22: The intersection improvements on SR 22 and Clyde Road at the Huntingdon Industrial Park entrance will cause lane closures throughout the project.

SR-22: The intersection improvements on SR 22 and Lexington Street at the Huntingdon Industrial Park entrance serving Dynamix Casting Fluxes will cause lane closures throughout the project.

SR-76 (US-79): The grading, drainage, noise walls, signals and paving on U.S. 79 (S.R. 76) from near S.R. 77 to near Cutlip Lane will cause lane closures throughout the project.

Meadowbrook Lane: On September 16, 2024, Meadowbrook Lane was closed.

Big Buck Road: On November 11, 2024, Big Buck Rd. was closed. A detour will be provided.

Monday June 16, 2025: Traffic will be shifted to the new alignment from near Cutlip Ln to the Connector Rd leading into Trezevant, speed limit reduced to 35 MPH.  Traffic will proceed down new alignment to an All Way Stop and then proceed onto Old US79 (SR76).  Also, there will be a traffic shift/run-a-round on SR 105 where new US 79 (SR76) crosses. 

Wednesday June 18, 2025:  Dorsey Rd is projected to close for utility realignment and road construction, weather permitting.  Detour route will be delineated by signage.

DYER COUNTY

SR-211: The bridge over the North Fork Forked Deer River (just south of Dyersburg) will have outside lane closures for inspection and evaluation beginning August 9, 2024.

GIBSON/CARROLL COUNTY

SR-76 (US-79): The grading, drainage, construction of a concrete box bridge, noise wall and paving on US 79 (SR 76) from west of Cades-Atwood Road in Gibson County to east of SR 77 in Carroll County will cause temporary lane closures throughout the project.

SR-76(US-79)/SR77- The new four-lane section is open and final work on the project will continue under traffic with intermittent lane closures. TDOT advises all motorists to exercise caution as they adjust to new traffic patterns.

GIBSON COUNTY

SR-420: The Resurfacing on SR420 from US 45W (SR 5) to SR 186 will cause temporary lane closures throughout the project.

HENRY COUNTY

SR-218: The Resurfacing on SR218 from SR77 to SR76 will cause temporary lane closures throughout the project.

OBION COUNTY

SR22: The Resurfacing on SR22 from SR5 to SR21 including bridge joint expansion joint repair will cause temporary lane closures throughout the project.

U.S. 51(SR3): The construction of turn lanes on U.S. 51 (S.R. 3) at Greenfield Drive/N. Morgan Street for State Industrial Access (SIA) support serving Williams Sausage HQ will cause an inside lane closure on U.S. 51(SR3) to thru traffic during construction. The cross-over at Greenfield Drive and N. Morgans Street will also be closed to thru traffic during construction. The Speed Limit is reduced from 50 mph to 40 mph on U.S. 51.

U.S. 51(SR3), U.S. 45 (SR 5):  Soil boring work will cause temporary lane closures on U.S 51 and U.S. 45 in South Fulton.  This work will take place in the interchange of U.S. 51 and U.S. 45 and areas immediately adjacent to the interchange along these routes.

Tags: Carroll County TNRoad ConstructionTDOT
Next Post
Trezevant Passes Budget, Hears Resident Concerns

Trezevant Passes Budget, Hears Resident Concerns

  • About
  • Privacy Policy
  • Home
  • Society
  • Editorial
  • Sports
  • News

© 2025 Carroll County Observer

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In
No Result
View All Result
  • Login
  • Register and Subscribe
  • Account
  • Password Reset
  • About

© 2025 Carroll County Observer